Combine material sourcing, sampling, approval, cutting, sewing, quality and shipping preparation into a realistic shirt production schedule.
Delivery time does not only consist of planting days
Fabric and accessory supply, sample revision, brand approval, cutting preparation, production, final control and packaging are parts of the same calendar. If one of these is based on assumption, the delivery date should be stated conditionally.
Create decision gates
The next phase should not be initiated until the required information or approval is completed. Rather than hiding uncertainty, this approach makes its impact on the deadline visible.
- Material and color approval
- Sample based on production
- Exact order distribution
- Label and packaging instruction
- Shipping and delivery information
How does order scale change the plan?
Number of preparations and changes for small, multi-model orders; For large orders, capacity, line balance and intermediate control plan come to the fore. In case of reorder, approved records can speed up the process, but the material lot must be re-verified.
Realistic deadline meeting
Erten Tekstil creates the delivery plan for brand-specific shirt production according to product, quantity, material and approval status. You can request calendar availability by sharing your target sales period and finalized decisions in the form.
See the same in the table before deciding.
Material and technical file
Sample and brand feedback
Cutting, sewing and intermediate controls
Packing and dispatch preparation
How do we approach this issue at Erten?
The calendar is managed in such a way that the person responsible for each stage and the completion condition are visible.
Content review area: Erten Tekstil product development, production and quality approach. Commercial suitability is also evaluated based on product and order information.Frequently asked questions about this topic
Is the delivery date finalized at the first meeting?
If there is not sufficient product, material and order information, only a preliminary estimate can be given; The plan becomes final as critical approvals are completed.
Does sample revision affect deadlines?
Depending on the scope of the revision, the material, pattern or operation plan may change and the schedule is re-evaluated.
Let's evaluate your production needs together.
Sharing your product category, approximate quantity and target date is enough to get started.
It is not necessary to have all the details ready at the initial consultation.