pajama production
Private label pajama production for your brand
Cotton pajama collections from product idea to sample and production; We develop projects on a project-specific basis, from brand labeling to packaging and shipping preparation.

Erten production approach
In pajama production, the skin feel of the fabric, pattern comfort, sewing details and washing behavior are considered parts of the same product standard.

pajama production
Collection and product development
Fabric, pattern and model details are considered together according to the target customer, season of use, product appearance and price position.
- Cotton fabric and surface options
- Fit, size and comfort evaluation
- Color, pattern and accessory direction

pajama production
Sample and production approval
Sample prepared from the technical product file or reference product; It is evaluated in terms of appearance, size, stitching and usage expectations.
- Model and size verification
- Sewing and accessory details
- Saved progress of changes

pajama production
Marking and preparation for shipment
The approved product standard is transferred to production controls; Label and packaging details are planned according to the brand's delivery expectations.
- Brand and care labels
- Product and packaging control
- Carton and dispatch preparation
before you decide
frequently asked
questions.
Which pajama projects might you consider?
Cotton pajama collections; It is evaluated on a project-specific basis based on product structure, fabric expectation, approximate quantity, target schedule and technical details.
What information is required for pajama production?
If available, the technical product file or reference product, size chart, fabric expectation, color-pattern, approximate quantity, brand-packaging details and target delivery date speed up the initial evaluation.
What is the minimum order quantity and production time?
Order quantity and schedule; It varies depending on the number of models, fabric, color, size distribution, accessories and sample approvals. The binding scope is shared after reviewing the project information.
your product
Let's produce together.
Start with the product type, approximate quantity and target date so we can plan the sample and production route.
Start production call