We manage your brand's shirts from idea to shipment in the same production order.

We plan product development, sampling, cutting, sewing, quality control and shipment preparation with clear successive decision points.

You can start with the product type, approximate quantity, and target delivery date.

Erten Tekstil Istanbul shirt production facilityOur production facility in Istanbul

Brand-specific product development

Mass production based on approved sample

Quality control throughout production

Production facility in Istanbul

From within the production

See our production structure in a real working environment.

Watch how product development, fabric preparation, cutting, sewing, washing, ironing and shipping steps come together in the same production layout.
The video is loaded from YouTube only after you choose to play it.
watch on YouTube

Production flow

YOU DREAM IT, YOU DESIGN IT,
WE PRODUCE IT FOR YOU

Six-stage working order that maintains the same product standard from your request to shipment.
  1. 01

    Demand and production evaluation

    The shirt group, approximate quantity, target quality and delivery expectation are evaluated together.

    The output of this stageInitial scope with clarified manufacturability
  2. 02

    pattern, fabric and accessory development

    Size, pattern, fabric, button, label and other product details are determined according to your brand goal.

    The output of this stageProduct description ready for sample
  3. 03

    Sample and customer approval

    The first sample is evaluated; The necessary changes are recorded and the approved product is obtained.

    The output of this stageApproved sample forming the basis of mass production
  4. 04

    Cutting and production preparation

    Approved size and product criteria are transferred to the production file; fabric and cutting plan is prepared.

    The output of this stageReady for planting, traceable production batch
  5. 05

    Controls during planting and production

    Collar, cuff, stitching and measurement details are monitored at designated control points during production.

    The output of this stageMass production in compliance with the approved sample
  6. 06

    Final inspection, packaging and shipment

    Completed shirts are checked for appearance, size and workmanship and prepared according to packaging decisions.

    The output of this stageCompleted order ready for shipment

Real production environment

We show our capability not through words, but through production.

Erten Tekstil digital fabric cutting system
01

cutting infrastructure

Digital cutting layout that carries pattern and order information to production preparation.

Erten Tekstil Button application in shirt sewing
02

Special workmanship for the shirt

The production process in which collar, cuff, button and sewing details are applied on the product.

Erten Tekstil pattern and cutting preparation team
03

Production preparation

Preparation area where pattern, fabric and cutting decisions are managed together before mass production.

Completed white shirts from Erten Tekstil production

Before starting production

We transform the right information into the right decision.

01

expected from you

Product type, reference or design, approximate quantity and target delivery date.

02

What is Erten doing?

It evaluates the demand in terms of product structure, materials, workmanship, capacity and quality expectations.

03

The output presented to you

Production suitability, decisions to be clarified and proposed sampling plan.

04

confirmation point

Mass production; It starts after your product details and sample approval are completed.

before you decide

Clear answers about production.

01What information is required for production evaluation?

Product type, approximate quantity, size chart or reference product if available, fabric expectation and target delivery date are sufficient for the initial evaluation.

02How to evaluate the approximate production quantity?

Order quantity; It is evaluated together with product structure, fabric and accessory selection, workmanship details and target delivery date. The appropriate production scope is clarified at the first meeting.

03How does the sample and modification process proceed?

Measurement, pattern, fabric, accessory and workmanship decisions are evaluated on the first sample. Changes are recorded and mass production begins after customer approval.

04Which details can be applied specifically to the brand?

Pattern, size, fabric, collar, cuff, button, label, accessory and packaging details can be developed specifically for your brand in line with the product target and production suitability.

05At what stages is quality controlled?

Checks begin in production preparation; Measurement and workmanship points are monitored during sewing, and completed products are re-evaluated before packaging and shipment.

06How to determine the delivery date and shipping schedule?

Delivery plan; It is created according to the approved product scope, quantity, material preparation and production schedule. Important decisions and possible changes are shared with the buyer team.

Related contents

Next steps to support your decision.

Start production conversation

Let's plan your collection together.

Share your shirt line, approximate quantity and target date; Let's evaluate the production suitability together.Share your product information Basic product information is sufficient for the initial evaluation.