your question

Is it enough for me to just tell the manufacturer the target date?

A target date is required, but sample approval, fabric sourcing and packaging decisions are also included in the calendar. We can start with what is ready and determine together the person responsible for the clear decisions and the date.

Review the order and delivery process
01

The plan does not consist only of the production start date

Shirt production plan; It is an interconnected calendar of product information preparation, fabric and accessory decisions, sample development, approvals, mass production, final inspection and shipment preparation.

The plan should be established with responsibilities and approval dates, as a missing decision at one stage may affect subsequent actions.

02

See order scope in one table

Model, color, size and quantity distribution are the basic input of the production plan. Differences in materials and packaging should also be noted in the same context.

  • Model and color list
  • Size-quantity distribution
  • Fabric and accessory direction
  • Labelling and packaging requirements
Sample and production planning environment
Sample and production planning environment
Review the order and delivery process
03

Record the stage, person responsible, required approval and date

Write each stage on a separate row. In the responsibility field, enter the person who will follow up on the work; in the required approval field, add the file or sample version to be used and the party making the decision. Distinguish target dates from confirmed dates in the date field; do not fill in unresolved fields as though they were final.

  • Stage: Sample evaluation | Person responsible: Brand decision-maker | Required approval: Sample and measurement chart version | Date: To be agreed jointly for feedback
  • Stage: Cutting preparation | Person responsible: Production planning representative | Required approval: Pattern, fabric and size–quantity breakdown | Date: To be confirmed once inputs have been verified
04

Share the current version of the plan

Keep the date of each decision and the relevant file version in the same record. When responsibility or approval details change, share the updated plan with the relevant parties. See the lead time guide for timing estimates and the impact of revisions on the delivery date.

05

Plan around approval stages

For each production stage, specify the information and approvals needed alongside start and end dates. Plan fabric, sample and packing approvals to determine when the next stage can begin.

  • Material approval
  • Sample based on production
  • Order distribution verification
  • Packaging and shipping information
06

Track pending decisions separately

For a pending approval, record the decision-maker and the expected response date. When approval is received, enter the file version and decision date in the relevant row of the plan so that the production team does not mistake an old comment for a current instruction.

07

Pre-order checklist

Scope

Model, color, size, quantity and brand details

Material

Selection and approval status of fabrics and accessories

Approval

Sample, change and decision responsible

Delivery

Packaging, parcel and destination shipment preparation

08

How do we approach this issue at Erten?

We create the production plan based on product, material and sample information. Together, we define who is responsible for each stage, the required approvals and the dates.

Guide topic: Production planning and order management approach. Production feasibility is assessed separately using the product and order details.

Frequently asked questions about this topic

When will the shirt production schedule be finalized?

Once product scope, material availability, sample route, order distribution and required approvals are verified, the applicable schedule can be clarified.

Does approval time on the brand side affect the plan?

Yes. Brand approval times are part of the plan as sample and material feedback can influence the start of subsequent stages.

Let's see together

Let's talk about your product.

Share your target delivery window and current readiness; Let's take realistic steps.

It is not necessary to have all the details ready at the initial consultation.