Separate the purposes of pattern, development, sales and pre-production samples; Plan the revision, cost and approval process correctly.
Sample type determines expected decision
A fit sample checks size and silhouette; a development sample checks materials and workmanship; a pre-production sample confirms the complete standard for bulk production. Expecting a sample to answer questions outside its purpose creates rework.
Factors affecting cost and time
Special fabric or accessory sourcing, new pattern development, hand crafting and repeat revisions change the sample scope. Mass production price and sample cost may not be based on the same operating assumption.
- New or existing pattern
- Original or representative material
- Special accessory preparation
- Number of revisions and scope of changes
- sample cargo
Content of the confirmation record
Comments should be collected in a single list with the markings on the photo, size changes and material codes. Final approval; It must show the sample ID, size chart, fabric, accessories and any open exclusions.
Determine the correct sample path
Erten Tekstil plans the sample type according to the decision need of the project in the production of brand-specific shirts. In the form, you can share your reference product, ready files and the question you are looking for an answer to in the sample.
See the same in the table before deciding.
pattern, development, sales or production approval
Principal or representative election
Single list and version tracking
Combined reference based on production
How do we approach this issue at Erten?
Each sample round is planned to cover an open decision question.
Content review area: Erten Tekstil product development, production and quality approach. Commercial suitability is also evaluated based on product and order information.Frequently asked questions about this topic
Can mass production be started with a single sample?
Based on the clarity of the product information and the initial result, it may be possible; It is important to verify all production decisions rather than numbers.
Why is sample different from mass production unit price?
Single piece preparation, pattern development, special material and revision processes create a different cost structure.
Let's evaluate your production needs together.
Sharing your product category, approximate quantity and target date is enough to get started.
It is not necessary to have all the details ready at the initial consultation.
