Fit and wearing comfort
Fluid fabric can sit closer to the body at the same measurements. Assess chest, waist and sleeve ease alongside drape. Hanging appearance alone is insufficient: also review movement and seated fit on the model.
Bamboo Shirts
For shirts containing bamboo-derived fibres, we check the fabric composition against supplier information and review softness, drape and measurements after washing on samples.
Request a production quote
Erten production approach
Style and colour options

A soft colour and simple front highlight drape. Select collar support that does not make the fabric feel unnecessarily rigid.

Dark colour and a clean fastening can suit a restrained business collection. Seams and placket should sit without waviness.

On pale fabric, pocket layers and internal support may show through. Compare weight and opacity on a physical sample.

Bamboo Shirts
For bamboo-derived viscose and related blends, fibre descriptions and percentages are checked against supplier information. Documented composition guides material selection and labelling.

Bamboo Shirts
Samples of fluid fabrics are checked for seam balance, collar support and hem drape. Measurements, appearance after washing and care requirements are reviewed before bulk production.

Bamboo Shirts
Start with a reference shirt, measurement chart or design file. We can agree on styles, colours, sizes, quantities, labels and delivery country, then prepare a sample and quotation plan.
Product development guide
Fluid fabric can sit closer to the body at the same measurements. Assess chest, waist and sleeve ease alongside drape. Hanging appearance alone is insufficient: also review movement and seated fit on the model.
Assess seam slippage, needle marks, placket waviness and dimensional change after care with the selected fabric. Match fibre name and percentage to supplier records. The material name alone is not evidence of antibacterial or environmental performance.
Base care methods on the actual fibre blend and finish. Review dimensions and handle after wet processing. Check that collar, cuffs and body remain compatible after care.
Preparing for samples and a quote
If your tech pack is not ready, we can start with a well-fitting reference garment, measurements and visual references. Agree fabric, fit and trim approvals before production.
Request a quote for this styleA shirt fit and sizing sample takes approximately 3–7 working days, depending on garment details, material availability and complete product specifications.
A shirt sales sample takes approximately 2-4 weeks; revisions and material sourcing may affect timing.
Shirt manufacturing through to dispatch preparation may take approximately 3–6 weeks. The schedule is set once order details and approvals are confirmed and materials are ready.
Before you decide
Request the precise fibre composition, percentages, weight and available test records. Claims such as antibacterial performance require separate verification for the specific fabric.
Choose the collar pattern, support and stitching together with fabric weight. Support that is too rigid may conflict with the natural drape. Assess the balance between collar and body on the pressed sample and after care.
Share your product type, approximate quantity and target delivery date. We can plan sampling and production together.
Start a production enquiry