your question

What was the first sample released before mass production?

It is usually the first sample that translates the product idea into patterns and workmanship. This example is not final approval; Makes subsequent size, fabric and accessory decisions visible. Specifying up front which sample you want and for what purpose makes the job easier.

Explore the sampling process
01

Sample type determines expected decision

A fit sample checks size and silhouette; a development sample checks materials and workmanship; a pre-production sample confirms the complete standard for bulk production. Expecting a sample to answer questions outside its purpose creates rework.

02

Factors affecting cost and time

Special fabric or accessory sourcing, new pattern development, hand crafting and repeat revisions change the sample scope. Mass production price and sample cost may not be based on the same operating assumption.

  • New or existing pattern
  • Original or representative material
  • Special accessory preparation
  • Number of revisions and scope of changes
  • sample cargo
Sewing stage of shirt sample
Sewing stage of shirt sample
Explore the sampling process
03

Content of the confirmation record

Comments should be collected in a single list with the markings on the photo, size changes and material codes. Final approval; It must show the sample ID, size chart, fabric, accessories and any open exclusions.

04

Determine the correct sample path

Erten Tekstil plans the sample type according to the decision need of the project in the production of brand-specific shirts. In the form, you can share your reference product, ready files and the question you are looking for an answer to in the sample.

Preparation for the production meeting

Need a tech pack?

Have a product idea? Record the style, fabric, colors and estimated quantity. You can finalize unknown measurements during sampling.
05

See the same in the table before deciding.

Purpose

pattern, development, sales or production approval

Material

Principal or representative election

Comment

Single list and version tracking

Approval

Combined reference based on production

06

How do we approach this issue at Erten?

Each sample round is planned to cover an open decision question.

Content review area: Erten Tekstil product development, production and quality approach. Commercial suitability is also evaluated based on product and order information.

Frequently asked questions about this topic

Can mass production be started with a single sample?

Based on the clarity of the product information and the initial result, it may be possible; It is important to verify all production decisions rather than numbers.

Why is sample different from mass production unit price?

Single piece preparation, pattern development, special material and revision processes create a different cost structure.

Let's see together

Let's talk about your product.

Write what you want to learn from the first example; Let's choose the right sample step together.

It is not necessary to have all the details ready at the initial consultation.