Learn how we assess minimum order quantities alongside the style, fabric, colour and size mix and the proposed production set-up.
A single quantity figure does not explain all projects
Minimum production quantity is assessed alongside product construction, the number of styles, fabric sourcing, colours, size breakdown and customised trims. Please share the order breakdown as well as the total quantity.
Splitting an order affects manufacturing feasibility
Even if the total quantity seems sufficient, a large number of styles, colours or small size distributions may change the production plan.
- pieces per style
- pieces per colour
- Size distribution
- Use of the same or different fabrics
- Special trims and packaging
Separate sample and bulk production quantity
The product development and sample phase is not the mass order itself. Sample purpose and bulk production target should be explained separately in the initial consultation.
Ask the right question
Alongside ‘What is your minimum order quantity?’, ask ‘What production set-up can support this collection mix?’ This gives you a sounder basis for planning.
Total quantity and producible distribution are not the same thing
The fact that the order consists of hundreds of parts does not provide sufficient information on its own. Dividing the same total into multiple style, colour and small size groups changes the cut, material and production plan.
If similar styles can use the same fabric or trims, the order can be planned more efficiently. Please provide the collection split in table form before quotation.
- Pieces per style and colour
- Size distribution
- Shared fabric and trims
- Packaging or label differences
Evaluate order size together with business target
An initial order, sales test or follow-on collection creates different planning needs. Focusing on product categories that matter to the target customer, rather than introducing too many styles, provides a more manageable starting point.
If there is a possibility of reordering, material continuity, measurement standard and preservation of approved sample records should also be discussed.
See the same in the table before deciding.
Pieces per style, colour and size
Sourcing arrangements for the fabric and custom trims
Number of shared and style-specific production decisions
Repeat-order and material-continuity requirements
How do we approach this issue at Erten?
Order feasibility depends not only on total quantity, but also on whether the collection split can be manufactured and on the material decisions.
Content review area: Purchasing and production planning approach. Commercial suitability is also evaluated based on product and order information.Frequently asked questions about this topic
Is there a fixed minimum quantity for Erten?
Manufacturing feasibility depends on the product and order structure. For your current order, please provide the style, colour, size and approximate quantity split.
Let's evaluate your production needs together.
Low minimum orders: share your product and approximate quantity so we can assess a suitable starting quantity together.
It is not necessary to have all the details ready at the initial consultation.
